New Build Project – Newcastle Upon Tyne

Fumetec Ltd were appointed by Robertson’s construction as contractor to carry out a new build project in the North East. The project involved the design, manufacture, installation, and commissioning of 19 No Industrial Fume Cupboards Associated PVC Extract systems Stainless Steel Benching Spray booth Associated laboratory fittings The project was scheduled over 8 months in […]

Stainless Steel Dissection Tables

Fumetec working alongside our partners Iab Lab Ltd have completed a new project at a hospital in the North West. The project involved a number of dissection tables all linked into a single PVC Extract System. The dissection tables were manufactured under a high specification for Chemical resistance purposes and included; • Constructed from 316 […]

4.5mtr wide – Walkin Enclosure Unit

Fumetec Ltd recently installed a new enclosure unit at a chemical plant in North Wales. Our project team was challenged to design and build a 4.5mtr x 1.8mtr x 2.6mtr high walk-in type enclosure unit with 2 No Bi-folding doors. The unit also provided 3 No evolution Atex rated extract arms. This involved the team […]

New Product – Battery Charging Station

Fumetec Ltd was recently approached by a blue chip company in partnership with Encon to undertake a new project undertaking the design, manufacture, installation & commissioning of 2 No new battery stations. The project involved a full design review before drawings were produced and approved. Following the design stage, the units were put into manufacture […]

New Laboratory Fit-Out

  Fumetec Ltd carried out a new project locally which included a full turnkey package. The full contract included the following; • 1 No Fume Cupboard• 1 No Fume Hood• UPVC Extract System• M&E Connections• Commissioning The fume extract system was manufactured from UPVC and consisted of a main header serving both the 1500mm wide […]

New Polypropylene Fume Cupboard

  Fumetec have recently installed an 1800mm wide Polypropylene Fume Cupboard. The Fume Cupboard was primarily made from 6mm Beige Polypropylene hand crafted by one of our skilled plastic fabricators.  The unit came complete with a perspex sash and polypropylene fully bunded worktop ensuring chemical resistance to a high standard.  To meet containment requirements, the […]

New Ductwork systems installed in Plymouth

  Fumetec have recently completed the installation of extract systems in Plymouth. The project involved design, manufacture and installation of Fume Extract Systems serving 8 No Fume Cupboards. The external ductwork was supported on a bigfoot isolation and unistrut support system. Installation complied with quality standards BS EN 14175-2:2003 and the construction code of the […]

Fume Cupboards and Associated Extract systems – Swansea

  Fumetec have recently undergone a project in Swansea consisting of 9 Fume Cupboards, 7 No extract hoods, 6 No alsident arms and a quantity of local extract points linked into 15 No extract systems.  The project was required to be installed within a 3-month timescale and delivered within budget and on time.