Fumetec Ltd was recently approached by a blue chip company in partnership with Encon to undertake a new project undertaking the design, manufacture, installation & commissioning of 2 No new battery stations. The project involved a full design review before drawings were produced and approved. Following the design stage, the units were put into manufacture and assembled within our factory taking approximately 4 weeks.

The installation was carried out by our specialised fitters operating at 2 different plants within the UK working to high health and safety standards and ensuring quality standards were maintained at all times throughout the installation.

The project was delivered on time and within budget. If you are interested in this bespoke product or looking for something similar then please do not hesitate to contact projects on enquiries@fumetec.co.uk

FUME CONTROL SPECIALISTS

Get a Quote

Your Information